
Current status:
oprational.
Autoloader flexfoil clip to be installed later.
Phase plate broken, to be replaced later.
Scheduled maintenance:
none
Planned maintenance:
AL flexboil clip, phase plate. Update Rapid.
Other works that may interrupt the operation in the future:
none.